Explore Hilliard Ground Engineering’s latest projects showcasing our expertise in slope stabilization, micro piling, soil nailing, and more. Each project reflects our commitment to precision, reliability, and sustainable construction practices, delivering robust solutions tailored to meet diverse client needs and environmental challenges.

What a busy weekend we had in Bray Head for our client, Iarnród Éireann Irish Rail!

DCEL completed the first of two 52hr possessions of the  Bray to Greystones rail line as part of the Bray Head Rock Netting project. We drilled and grouted over 180nr rock anchors at heights of up to 24.0m with the assistance of our good friends, Hilliard  Ground Engineering .

It was a huge effort from DCEL, Hilliard Ground Engineering ., and the Iarnród Éireann Irish Rail teams all working cooperatively to complete the works, in an area with difficult accessibility and under time constraints.

The second 52hr possession will involve the installation of over 2,500m2 of rock netting and will be completed at the end of September.

Busy little drillers. Working away. 133 holes drilled now.

Busy little drillers. Working away. 133 holes drilled now. 44 more to go. All drilling done with Mincon DTH hammers. Looking to install Minova R32 Twin Coat bars.
Keep up the good work team HGE and Donnelly Civil Engineering Ltd

and so it begun. 4 drills on Bray Head

…..and so it begun. 4 drills on Bray Head. We will have drone footage later.
Good work by Team HGE and Donnelly Civil Engineering Ltd

Loads 4 and 5 heading for Bray Head

Loads 4 and 5 heading for Bray Head on the Irish Rail job with Donnelly Civil Engineering Ltd Load 6 going in on Friday.
Going to be some fun this weekend.

Loads 4 and 5 heading for Bray Head

Loads 4 and 5 heading for Bray Head on the Irish Rail job with Donnelly Civil Engineering Ltd Load 6 going in on Friday.
Going to be some fun this weekend.

The first of 6 loads of materials and drilling heading

The first of 6 loads of materials and drilling heading for a railway job on Bray Head for Donnelly Civil Engineering Ltd for 2 long weekends of work to secure 2 rock faces.
This load will be delivered on Monday morning at 8.30. With more to follow for a dreaded Friday the 13th start.

Commenced this week with a new client

Commenced this week with a new client, Greencells Group who are installing a Solar Farm. Some difficult ground conditions required us to do some predrilling. Due to the tight space between the existing installed piles we used our 8 ton Takeuchi and mast to get around.

Commenced this week with a new client

Commenced this week with a new client, Greencells Group who are installing a Solar Farm. Some difficult ground conditions required us to do some predrilling. Due to the tight space between the existing installed piles we used our 8 ton Takeuchi and mast to get around.

At T2 Dublin Airport.

At T2 Dublin Airport. Would be great to be going on holidays. Not today however. We are Installing T76 Minova micro piles to 13.0 Mtrs into rock.
For our good friends BRAZIL PILING AND FOUNDATIONS. Drill being use is our very reliable Casagrande UK M6A with a EURODRILL GmbH rotary percussive drill head. Knocking out 7 per shift. We will be here a while.